
Challenge
What the site asked of us
A full-height hanging work that had to read as one composition from floor to ceiling, with load shared safely across multiple suspension points.
Approach
How we worked
Site assessment of structure and access → suspension method agreed → protected floor and surrounding finishes → sequenced hang → laser and sight-line checks → final walkthrough.
- Working height
- Multi-point suspension
- Sight-line alignment
- On-site protection
Result
What you see
A stable, evenly spaced installation photographed during the hang. No client name or city is published without permission.
Services